Reinforced concrete structures for objects C-124, C-126, and part of trestle bridge CE-3 and networks of wastewater system connections in mechanical granulation system 2

Konstrukcje żelbetowe dla obiektów C-124, C-126 i części estakady CE-3 oraz sieci przyłączy kanalizacyjnych na instalacji granulacji mechanicznej II

Reinforced concrete structures for objects C-124, C-126, and part of trestle bridge CE-3 and networks of wastewater system connections in mechanical granulation system 2

February-December 2015. Grupa Azoty in Tarnów

SCOPE OF IMPLEMENTED WORK:

Completion of reinforced concrete structures: foundation slabs, foundations, surface slabs, wall bases and support structures for posts, trestle bridge foundations, process wastewater tank, reactor waste tank, concrete and reinforced concrete foundation walls for walls of fine-sized ceramic elements, reinforced concrete slabs constituting supporting structure for the floors, reinforced concrete structures for draining industrial wastewater from the roof, cable duct, ammonia tank slab drainage system.

Prefabrication and assembly of steel structures. Changing the pipeline course and disassembly of a section of the trestle bridge. Installation of technological devices and apparatus. Completion of rainwater drainage systems for the roof, roads, and yards. Completion of sewage drainage systems for buildings.